Lean Manufacturing Principles and 5S Methodology for Waste Identification and Elimination in a Manufacturing Unit: A Semi-Quantitative FMEA-Based Framework and KPI Audit System with a Numerical Illustration

Authors

  • Singh Siddharthkumar Anilkumar
  • V. K. Patel

Keywords:

5S methodology, Failure Mode and Effects Analysis (FMEA), Kanban, Lean manufacturing, Muda, Overall Equipment Effectiveness (OEE), Pareto analysis, Waste Priority Number

Abstract

Manufacturing units face continuous pressure to cut costs, shorten lead time, and improve quality without new capital equipment. Lean manufacturing meets this pressure by removing non-value-adding activity, yet small and medium-sized enterprises (SMEs) often lack an objective way to decide which waste to tackle first. This paper presents a diagnostic, prioritisation, and audit framework that combines lean principles and the 5S methodology with a Waste Priority Number (WPN = S × O × D) adapted from Failure Mode and Effects Analysis (FMEA). The framework comprises (1) semi-quantitative WPN scoring, (2) a Pareto loss accounting model, (3) a distinction between overproduction as a root cause and inventory as its buffering consequence, and (4) a Key Performance Indicator (KPI) audit suite. A hypothetical numerical illustration, set in a CNC machining and assembly unit, shows how the framework is applied and read; all values are assumed, and no plant data were collected. In the illustration, overproduction, defects, and waiting rank highest (WPN = 60, 60, and 48) and account for 77.6% of the assumed monthly waste cost, and an assumed 12-week programme of Kanban, Single-Minute Exchange of Die (SMED), Poka-Yoke, autonomous maintenance, and 5S lifts Overall Equipment Effectiveness (OEE) from 61.2% to 78.7%. These values are not empirical findings, and validation in real plants is the next step. The framework links qualitative lean principles with quantitative shop-floor audits.

Published

2026-10-29

Issue

Section

Articles